Pyrotec General 2.2 General Incinerator Range
Pyrotec General 2.2
The Pyrotec G is a modern incinerator designed to burn solid waste in a
clean and environmentally safe manner. Using the Pyrolytic principles of combustion, it is particularly suited for a wide range of waste material.
This model is specifically for burning general waste from factories, offices, schools, Government departments and is equipped with the necessary sophistication of control, secondary chamber volume, manual or automatic loading options and chimney.
Models: | G150, G200, G250, G300, G350, G400 and G500. |
Waste type: | General waste: Calorific value 4,000 KCal/Kg, density 50 to 100 Kg/m³. Type 0 waste: Calorific value 4,720 KCal/Kg. Type 1 waste: Calorific value 3,611 KCal/Kg. Type 2 waste: Calorific value 2,388 KCal/Kg. |
Construction: | Mild steel fabricated construction using 6mm steel plate suitably braced and stiffened. |
Refractory: | Primary Chamber: Hot face material 1,400ºC quality 115mm thick, backed by 76mm of Calcium silicate insulation. |
Secondary Chamber:Hot face material 1,600ºC quality 115mm thick, backed by 76mm Calcium silicate insulation. | |
Fuel: | Natural gas, LP gas or 35 seconds fuel oil. |
Electrical supply: | 220/240 Volt. 1 phase. 50/60Hz – manual loading. 380/440 Volt. 3 phase. 50/60Hz – automatic loading. |
Burners: | Automatic package burners complete with electric ignition and flame failure control complete with all necessary valves, motors and integral continuous running fan. Time clock or temperature controlled (automatic loading) to provide optimum combustion conditions, secondary chamber temperatures and fuel economy. |
Primary Chamber: one @ 100,000 KCal/Hr on/off control. | |
Secondary Chamber: one or two @ 200,000-350,000 KCal/Hr on/off control, (high/low control, automatic loading). Size to suit model. | |
Fans | All combustion and cooling air is provided by manually adjusted or automatically controlled (automatic loading) centrifugal fans which provide air to nozzles strategically located throughout the combustion chambers to ensure complete optimum conditions. |
Finish | Two coats of primer followed by two coats of enamel finish in burgundy. |
Control panel | Automatic control system built to IEC Standards incorporating PLC controller, as necessary, providing all automatic plant functions and incorporating the following sequences. 1. Preheat The control panel will be equipped with an active mimic diagram showing operating status of the plant together with temperature indication of primary and secondary chambers (automatic loading). Manual loading, temperature indication only. manual loading |
Loading | Manual loading Automatic loading |
Loading/ash removal door | Located to give access for ash removal from the main combustion chamber a refractory lined hinged door with locking handle will be provided. |
Chimney | Incinerator mounted manufactured from Mild Steel and lined with 65mm of 1,400ºC refractory. |
Alternative Chimney | When an existing or steel floor mounted chimney is to be used, exhaust gases will be cooled to 400ºC using a blower fan and cooling chamber prior to chimney entry. |
wiring | Electrical wiring will be carried out in PVC covered cable, run on cable trays. |
Fuel Piping | Fuel piping between the burners will be completed terminating in a single connection point on the incinerator. |